Seven refined residences in Santos aquisition
One Vision of Timeless Elegance.
Authentic Lisbon architecture reinterpreted for modern living
Interiors by MAM Studio & MOT Studio
Private parking for each apartment
800 m² landscaped garden
Completion scheduled for December 2027
Just steps from the river and Lisbon’s creative core, Time Out Market, Santos Station, and Cais do Sodré Metro all within a short walk.
| Floor | Unit | Type | Indoor | Outdoor | Parking | Price | Floorplan |
|---|---|---|---|---|---|---|---|
| 3 & 4 | I | T4 Duplex Penthouse | 230 m² | 49 m² + pool | 2 | € 4 425 000 | View |
| 3 & 4 | J | T3 Duplex Penthouse | 269 m² | 14 m² + pool | 2 | € 4 250 000 | View |
| 1 & 2 | F | T4 Duplex | 283 m² | 8 m² | 1 | € 2 875 000 | View |
| 2 | G | T3 | 114 m² | 2 m² | 1 | € 1 275 000 | View |
| 1 | D | T3 | 107 m² | 18 m² | 1 | € 1 075 000 | View |
| 2 | H | T1 | 85 m² | 5 m² | 1 | € 775 000 | View |
| 1 | E | T1 | 73 m² | - | - | € 625 000 | View |
FINISHES & DESIGN SECTION
A Dialogue Between Past and Present
Boavista 77 celebrates Lisbon’s architectural identity through carefully curated materials and craftsmanship.
-
Solid wood tabua corrida floors
Natural stone window frames
Traditional saia e camisa ceilings
Preserved façade and structural rhythm
-
Integrated kitchens and laundry rooms
Minimalist railings and light tones
Reversible air conditioning and solar panels
Energy-efficient windows and natural ventilation
-
Set between Lisbon’s historic centre and the riverfront, Santos offers a vibrant lifestyle with designer studios, galleries, and renowned restaurants. Boavista 77 sits near the EDP headquarters and Time Out Market, approx. 250 m to Santos Train Station and 700 m to Cais do Sodré Metro (and ferry), and about 300 m to the future Santos Metro station.
INVESTMENT & TIMELINE
A Secure Investment Opportunity
Approved by the Lisbon Municipality in September 2024, Boavista 77 holds a valid PIP (Preliminary Information Request) under current Portuguese law, equivalent to a construction license.
This ensures a fast-track and transparent development process, with completion scheduled for December 2027 (18-month construction period).
Payment Schedule:
Reservation
5 %
2025
Provisory Agreement (at administrative subdivision step)
30 %
JAN 2026
Phase 1 Completion
20 % (Structure completed)
DEC 2026
Phase 2 Completion
20 % (Building airtightness & networks)
JUNE 2027
Key Handover
25 % (Finishes completed)
*Subject to final City Hall license
DEC 2027*
INTERESTED? REACH OUT
Discover Boavista 77
A rare opportunity to live or invest in the heart of Lisbon’s most connected and vibrant district.
Residences available on plan completion scheduled for December 2027.